The AC Main and Sub panels took some clever wiring in order to run some loads through the inverter and other loads only on shore power.  Other than that, there was ample space for a quick install.  Thanks, Ron!

Hearland+Bighorn+3575EL

Equipment Added:
4x 160W Panels
1x Roof C-Box
1x SunRunner Signature MPPT 40A System Core
4x 19.5″ Tilt Bar Sets
4x AGM 4CT 6V 220Ah Batteries
1x Magnum MS2012 inverter
1x Magnum ME-RC50 Remote

640W of solar panels
640W of solar panels
Tidy wiring on the battery bank, shunt, breaker, fuse and disconnect
Tidy wiring on the battery bank, shunt, breaker, fuse and disconnect
A very complex AC distribution panel