Back

When our installation schedule permits, we occasionally take on small solar trouble shooting projects.  This client came to us with an old solar charging system that wasn’t working properly (Not one of our jobs) and asked us what we could do to make it work.  We remounted the solar panel, changed out his cabling and connected his charge controller.  A system this size will maintain his batteries when the trailer isn’t in use.,

Scamp-Solar-Panel

Equipment Added:
1x 35mm Mount Set
1/4 tube of dicor
15.5′ 10/2
2 10-12 ga butt splices
6″ 3/4″ black heat shrink
2 10-12ga ring lugs w/ heat shrink